Planning Application Documents

Further Information Submission Leitrim County Council

Cover Letter

Further Information Response Leitrim County Council

Updated Natura Impact Statement

Appendix 1 –  Viewpoint 18 photomontage

Appendix 2 – Geological, Hydrological and Hydrogeological Responses

Appendix 3 – FT Responses to LCC Further Information Schedule

Appendix 4 – Updated Link Road Arrangement

Appendix 5 – Autotrack Assessment

Appendix 6 – Watercourse crossing design drawings

Appendix 7 – Updated Drawing 180511-19

Appendix 8a – Sligo and Ireland West Airports Correspondence

Appendix 8b – Aviation safety screening assessment

Appendix 9 – Surface water management plan

Appendix 10 – Updated Appendix A of 38kv Grid Connection – Construction Methodology

Appendix 11 – Updated Appendix 7.4 of EIAR

Appendix 12 – AWN Consulting Technical Note

Appendix 13 – Proposed Felling Area Maps

Appendix 14 – Decommissioning Plan

 

Further Information Submission Sligo County Council

Cover Letter

Further Information Response Sligo County Council

Updated Natura Impact Statement

Appendix 1 –  Geological, Hydrological and Hydrogeological Responses

Appendix 2 – FT Responses to SCC Further Information Schedule

Appendix 3 – Updated Appendix 7.4 of EIAR

Appendix 4 – Surface Water Management Plan

Appendix 5 – Watercourse Crossing Design Drawings

Appendix 6 – Updated Drawing No 08511-19

Appendix 7 – Updated Appendix A of 38kv Grid Connection – Construction Methodology

Appendix 8 – AWN Consulting Technical Note

 

 

Planning Documents
Application Cover Letter to Leitrim County Council
Planning Application Form – Leitrim County Council
Newspaper Notice – Leitrim Observer
Site Notice – Leitrim County Council
Third Party Landowners Letters of Consent
EIA Portal Confirmation – Leitrim County Council
Application Cover Letter to Sligo County Council
Planning Application Form – Sligo County Council
Newspaper Notice – The Sligo Champion
Site Notice – Sligo County Council
EIA Portal Confirmation – Sligo County Council
Planning Application Drawings
Application Drawings – Leitrim County Council
Application Drawings – Sligo County Council
Natura Impact Statement

Environmental Impact Assessment Documents

Non-Technical Summary
Environmental Impact Assessment Report
Chapter 1 – Introduction
Chapter 2 – Background to the Proposed Development
Chapter 3 – Consideration of Reasonable Alternatives
Chapter 4 – Description of the Proposed Development
Chapter 5 – Population and Human Health
Chapter 6 – Biodiversity
Chapter 7 – Ornithology
Chapter 8 – Land, Soils and Geology
Chapter 9 – Water
Chapter 10 – Air and Climate
Chapter 11 – Noise and Vibration
Chapter 12 – Landscape and Visual
Chapter 13 – Cultural Heritage and Archaeology
Chapter 14 – Material Assets
Chapter 15 – Interaction of the Foregoing
Chapter 16 – Schedule of Mitigation Measures
EIAR Bibliography
Appendices
2-1 Scoping Responses
2-2 Community Report
4-1 Site Layout Drawings (A4)
4-2 Peat & Spoil Management Plan
4-3 Forestry Replacement Lands Assessment
4-4 Construction and Environmental Management Plan
4-5 Drainage Layout Drawings
4-6 38kV Grid Connection – Construction Methodology
5-1 Wind Farms & Health Literature Review – Chapman 2015
5-2 House Prices Study – CXC Scotland 2016
6-1 Dedicated Habitat and Vegetation Composition Surveys
6.2 Bat Survey Report
6-3 Fisheries and Aquatic Report
6-4 Badger Sett Locations – CONFIDENTIAL
6-5 Peatland Enhancement and Habitat Enhancement Management Plan
7-1 Target Species List
7-2 Bird Survey Effort
7-3 Results Summary Tables
7-4 Bird Survey Data
7-5 Vantage Point No. 2 – Survey Data
7-6 Collision Risk Modelling Assessment
7-7 Bird Monitoring Programme
8-1 Geotechnical & Peat Stability Assessment Report
9-1 Flood Risk Assessment
9-2 Lab Certificates
9-3 Site Cross Sections
10-1 Carbon Loss Calculation
11-1 Glossary of Acoustic Terminology
11-2 Calibration Certificates
11-3 Modelling Assumptions
11-4 Details of Other Wind Farms
11-5 Noise Contour at Rated Power and Windspeed
11-6 Directional Noise Predictions – Cumulative
12-1 Landscape and Visual Impact Assessment Methodology
12-2 Landscape Character Assessment Tables
12-3 Viewpoints Assessment
12-4 ZTV, Viewpoints, Landscape Designations and Cumulative Baseline Map
14-1 Autotrack Assessment
14-2 Outline Traffic Management Plan
Photomontage Layouts
Viewpoint 1 – Carrowkeel, Co. Sligo
Viewpoint 2 – Castlebaldwin, Co. Sligo
Viewpoint 3 – Doorly, Co. Sligo
Viewpoint 4 -Collooney, Co. Sligo
Viewpoint 5 – Corwillick, Co. Sligo
Viewpoint 6 – Parke’s Castle, Co. Leitrim
Viewpoint 7 – Dromahair, Co. Leitrim
Viewpoint 8 – Carrigeencor, Co. Leitrim
Viewpoint 9 – Manorhamilton, Co. Leitrim
Viewpoint 10 – Killarga, Co. Leitrim
Viewpoint 11 – Drumkeeran, Co. Leitrim
Viewpoint 12 – Corry Strand, Co. Leitrim
Viewpoint 13 – Ballinaglearagh Village, Co. Leitrim
Viewpoint 14 – Drumshambo, Co. Leitrim
Viewpoint 15 – Ballynashe, Co. Sligo
Viewpoint 16 – Beagh, Co. Sligo
Viewpoint 17 – Tullynascreen, Co. Leitrim

 

 

Project Development Timeline

Oct 2017

General ecological studies commence in the wider study area

Jun 2018

Engagement begins with the near neighbours

Jul 2018

Meteorological wind measuring mast scoping studies progress

Sep 2018

Environmental Impact Assessment Team selected

Sep 2018

Meteorological wind measuring mast erection

Oct 2018

Environmental impact assessment studies commence

Dec 2018

Detailed environmental and engineering studies begin

Feb 2019

Landscape and visual assessment commences

May 2019

First stage design complete

Jun 2019

Site investigations continue

Sep 2019

Second stage design complete

Dec 2019

Impact and mitigation assessment and reviews continue throughout Autumn/Winter 2019

Jul 2020

Lodge Planning Permission Application

Apr 2021

Submission of Further Information to Sligo and Leitrim County Councils

Dec 2021

Awaiting decision from ABP